Variance Calculation (Individual Processing) (KKS2)

Menu: Accounting > Controlling > Product Cost Controlling > Cost Object Controlling > Product Cost by Order > Period-End Closing > Single Functions > Variances > Individual Processing

Process Overview: Calculate the variance value between Standard cost & Actual cost.


Screen 1:

Operation Process:

1. {{Order}} Enter the Order number.
Parameters
2. {{Period}} Enter the Fiscal Period.
3. {{Fiscal Year}} Enter the Fiscal Year.
4. {All Tgt Cost Vsns} Select this option if you want to include all target cost versions in the processing.
5. {Selected Target Cost Vsns Select this option if you want to include a specific version in the processing.
(Enter the version if selected.)
Processing options
6. {Test Run} Select this option to run test.
7. {Detail list} Select this option to display the detail list after processing execution.
8. Click [Execute]. (Test run)

Remarks:

1. For the first execution, select [Test Run] before execution.
2. If the test result is OK, deselect Test run option and execute.

Supplement:

When Selective target cost version is selected in Parameter, select a desired target cost version using the following processing:

1. Menu: Extras > Set Target Cost Versions...

2. Select this option to run test.
3.   Click [Confirm].

Screen 2:

Operation Process:

1. Check the calculation results.
2.   Click [Cost Elements] to check detailed variance calculation results.

Screen 3:

Operation Process:

1. Check the variance calculation results for each cost element.